Constructing of Pregolskaya TPP
Pregolskaya TPP includes four combined cycle plants with unit capacity of 113.8 MW per each power unit. New power sources will ensure the energy security of the Kaliningrad region and make its energy system more maneuverable. The power plant was commissioned in 2019.
For deliveries to the Pregolskaya TPP in 2017-2018, PTPA manufactured Valves and Gate Valves with Position Indicators, as well as non-standard size SPRV by special order.
The company`s products were also installed for the fire extinguishing system and on pipelines with drinking water.